Every house in the Hall & Hull Architects
Custom Residential Program involves several steps, many of which
will be unique to a specific project. Typically, however, all
projects go through the following phases.
[Programming and Site Analysis] This first stage, called Programming
and Site Analysis, is probably the most valuable time you will
spend with us. It is at this time you discuss the requirements
for your new house. It is also the time when you begin to test
the fit between what you want, what you need, and what you choose
to spend.
Share everything you can with us: your thoughts,
notes and sketches, photos from magazines-anything that illustrates
your vision. Tell us about your routines, the way you function
in your current home, and what you like and don't like about it.
Do not come in with solutions already decided
upon. Be prepared to explore new and creative ideas. Be very frank
about how you want the end result to look, feel and work. As Architects,
we will ask you several questions to get a better sense of your
goals and needs and to determine if your expectations match your
intended budget.
It's often said that Architects not only have
the answers; they also know which questions to ask: How many rooms
will you need? How will the house function? Who will use it and
how? What are your tastes? How long do you plan to live in the
house? Do you work at home? How much time do you spend in the
living areas, bedrooms, kitchen, library, office or utility spaces?
How much time and energy do you plan to invest to maintain the
house?
By asking a wide range of questions, we can
outline the scope of your project in detail. Doing so builds cost-efficiency
into your project. By setting parameters early in the process,
we can help you control costs before you ever break ground. We
may also suggest certain changes based upon our experience and
knowledge of the local conditions or construction markets.
After thoroughly discussing your functional
requirements, we will prepare a program and proposal outlining
the scope of your project. Typically, the program will include:
- A complete list of proposed rooms or spaces,
their functions, significant adjacencies or relationships, and
important equipment or furnishings.
- A practical square footage analysis and
cost estimate, including a contingency allowance, based on current
construction pricing and historical data.
- An initial site analysis, documenting the
existing site attributes.
- A projected design and construction schedule.
- An outline detailing our proposed services,
project fee structure, and an explanation of likely reimbursable
and consultant expenses.
- An AIA design Contract.
[Schematic Design] Once we have defined the scope of the project
and we have received your approval to proceed, we will create
the first series of drawings, known as schematic design. Primarily,
these are hand-drawn sketches showing the general arrangement
of the rooms or spaces and their layout on the site. These sketches
are not "finished" construction documents. They are meant to show
"possible approaches" for you to consider.
Don't panic if these first drawings seem different
from what you might have envisioned. Ask us to show you how these
designs satisfy the requirements of the program while taking advantage
of the unique characteristics of your site. If you have difficulty
understanding the sketches (many people do), just ask us to explain.
If you are not satisfied with the direction the project is headed,
we will revise and refine the schematic design until a solution
is developed that you agree meets your needs. Remember, it is
much easier to make changes now, when your project is on paper,
than later on during the construction process.
In most cases, we will present the first schematic
design to you in person. This allows us to get instant feedback
on the initial concepts. Often the presentation will include:
- A site plan, showing the project layout
and its relationship to the existing site assets. Significant
trees, view corridors, and other surrounding elements will be
depicted and may be supplemented with photos.
- Horizontal and vertical sections (floor
plans and building section cuts) showing the arrangement of
the programmatic spaces.
- Elevations (or other descriptive drawings
such as renderings or illustrative sketches) showing the character
of the architecture and it historical precedents. Depending
on the location of the site, a preliminary ARB (architectural
review board) submittal may also be necessary during this phase.
Requirements for these submittals vary depending on the community.
At this point, we will also revise our initial
square footage calculations, cost estimates, and schedules based
on the current design. However, there are still many details to
be established and market conditions, the availability of materials,
and other unforeseen situations may drive up costs. For this reason,
preliminary estimates are very general and you should include
a healthy contingency to cover any changes that arise as the design
matures.

[Design Development] After approval of the schematic design concepts,
the next step is design development. During this phase, we will
develop more detailed drawings, illustrating other aspects of
the proposed design. Horizontal sections begin to show all of
the rooms and spaces in the correct size and shape. Elevations
will depict materials and specific window sizes. Outline specifications
are also prepared listing the major materials and room finishes.
When looking at the design development drawings,
try to imagine yourself actually using the spaces. Ask yourself:
Do the traffic patterns flow well? Does each space serve the intended
purpose? Do I have a good sense of what it will look like? Do
I like how it looks and feels? Do I agree with the selection of
interior and exterior finishes, door types, windows, etc.?
In some cases, it may be necessary to bring
consultants into the design process. The design development phase
is often the best time to do this. If there are unique building
situations, you may require the services of an engineer. In addition,
you may wish to hire an interior designer or a lighting consultant.
We can help you select and coordinate all aspects of the project.
The design development documents are often
presented as a combination of hand-drawn sketches and CAD (computer
aided design) drawings. Typically, this presentation includes:
- An updated site plan, which includes: revisions
to the project layout; location of utilities and other site
improvements; preliminary drainage and erosion control; wetlands
and coastal council requirements; and any requested ARB or permit
variances.
- Updated horizontal and vertical sections
showing the arrangement of the programmatic spaces and revised
square footage calculations.
- Updated elevations depicting materials
and finishes.
- Preliminary construction details for unique
building situations.
- Preliminary equipment and finish schedules
- Preliminary regulatory agency and code
reviews.
- Revised project schedule and cost estimates.
Depending on the location of the site, an
ARB (architectural review board) submittal may also be necessary
during this phase. Requirements for these submittals vary depending
on the community.
Architects and contractors share long-standing working relationships,
which can help promote reliability and quality work. Sometime
during design development, or just after its completion, you will
need to select a general contractor for your project. We can make
recommendations based on your individual situation and requirements.
In most cases, our clients find it beneficial
to use the "negotiation process." Hall & Hull Architects is familiar
with the abilities and reputations of many general contractors.
By pre-selecting those who meet your qualifications, we can create
a short list for you to interview.
We can also help you evaluate a contractor
further by using a standard Contractor's Qualification Statement
(AIA document A305), to verify background, history, references,
and financial stability. When completed by the contractor, this
form provides a sworn, notarized statement assessing the important
aspects of the contractor's qualifications.
In some situations, you may wish to choose
among several contractors who have been asked to submit bids on
the project. When using this method, we will help you prepare
the bidding documents, which consist of drawings and specifications
as well as invitations to bid and instruction to all bidders.
The bidding documents are then sent to several contractors, who
within a given period of time, reply with bids, which include
the cost for building your project.
The lowest bidder is often selected to do
the work, but not always. We can help you make the contractor
selection based on the best value. A bid that is 30 percent lower
than all the other contractors might seem like the best deal.
A discrepancy, however, can be an indication that the bidder has
left something out of the bid, made a mathematical error, or did
not prepare the bid carefully. You might assume that a low bidder
is required to do the project for the bid amount, but an error
or omission in the bid may indicate a general contractor has made
a commitment, which they cannot fulfill. For a building project
to be a success, it is crucial that the contractor selection process
consider all factors.
Some items are required for construction documentation:
- Review contractor pricing
- Review and update budget and schedule with
owner
- Site Plan with relationships
- Determine fixtures, furnishings and work
to be provided by owner
- Submit copy of preliminary contract and
general conditions to owner
- Update site (see above)
- Update drawings (see above)
- Finalize schedules
- Finalize specifications
- Submit completed documents to the ARB for
approval
- Finalize Pricing
- Obtain owners authorization to proceed
[Contract/Construction Documentation] At this point, the architect
prepares construction documents, the detailed drawings and specifications
which the contractor will use to establish actual construction
cost and to build the project. These drawings and specifications
become part of the contract. When construction documents are finished,
you are ready to hire the general contractor or builder.
The important finishing touches, advised
by your architect, ensure continuity with the design of the home
and enhance of its architecture.
Some required for Construction Administration:
- Finalize any unresolved issues from previous
phase
- Determine construction protocol for project
meetings and approvals
- Determine protocol for correspondance with
owner
- Notify consultants of the selected contractors
and sub contractors
- Obtain, review, and approve construction
submittals and shop drawings
- Review and approve applications for payment,
change proposals, and change orders
- Provide progress reports
- Update budget and schedule periodically
(if required)
- Obtain and review required test reports
- Review Contractor's notice of substantial
completion
- Perform and maintain punch list
- Review Contractor's request for close out
of job
[Contract/Construction Services] This final step is often the
most anxiety-producing part of the whole process. Up until now,
your project has been confined to intense discussion, planning,
and two-dimensional renderings. When construction begins, your
project moves from an abstraction to a physical reality.
Our involvement does not stop with the preparation
of construction documents. We also provide construction administration
services. These services may include assisting you in hiring the
contractor, making site visits, reviewing and approving the contractor's
applications for payment, and keeping you informed of the project's
progress.
While the architect observes construction,
the contractor is solely responsible for construction methods,
techniques, schedules, and procedures. The contractor supervises
and directs the construction work on the project.
After the design
phases are complete, the management and scheduling of the construction
work is critical. Your architect has been through the construction
process many times; this may be the first time for you. Depend
on your architect as much as possible.
Due to their complexity
and technical nature, construction projects are typically described
in language and symbols that are unfamiliar to the average homeowner.
Architects understand the language of construction and can help
you protect yourself from incorrect interpretations of contract
requirements by the contractor.
The creative problem-solving
skills provided by an AIA architect during the project design
stage are still available to you during the construction phase.
With your architect personally administrating construction, you
get informed reports of the project's progress, a trained eye
toward quality control and protection against work that is not
according to plan. With any building project, the familiar caution
holds true: Expect the unexpected. Unanticipated problems-and
opportunities-will arise during the course of construction. With
an intimate knowledge of your project's history, the architect
is a valuable asset in seizing new opportunities that are consistent
with your design objectives.
Evaluating the
point at which a project is complete is not as simple as it seems.
In the last stages of construction, both you and the contractor
are tired and eager to move on. Your contractor may consider a
project is complete sooner that you. Your architect can weigh
the state of completion against the contract requirements and
fairly note any items that remain to be completed. Naturally,
there can be tension between a contractor's desire to get paid
as much as possible as soon as possible, and your need to see
that payments are in proper proportion to the work that is completed.
Your architect has the expertise to assess the contractor's payment
requests fairly. As your adviser, your architect can help prevent
overpayment so that the contractor doesn't get paid until all
obligations to you are fulfilled.
An architect's involvement doesn't end with preparing drawings
for the renovation. As your adviser and agent, the architect will
visit the site to protect you against work that is not according
to plan. With an architect observing construction, you get informed
reports of the project's progress, a trained eye toward quality
control and even a check on the contractor's invoices--mandating
that the contractor does not get paid until the architect is satisfied
that the contractor has fulfilled all obligations to you.
|